WUHU LIVESPOWER GLOBAL LTD · Wuhu, Anhui, China EN · RU · AR · FR  |  WhatsApp +86 156 6553 8866
Send a requirement survey
Home › Services & pricing
Services & pricing

Engineering you can buy by the piece. Prices on the page.

Robots are quoted after the survey, because the part decides the price. The engineering around them is standard work with a standard price — so it is published here, in USD and CNY, with the deliverables and the lead time. Every fee for a proposal is credited in full against the equipment order.

0cost for the requirement check
100 %of the proposal fee credited against equipment
5–10 dworking days to a proposal
USD 600a month for your China engineering desk

Start here

S0

Requirement check

Free, 3–5 working days

Send a survey and a drawing; get a written feasibility check, a first model choice and the open questions that decide the cell.

PriceUSDCNY
—Free免费

You receive

  • 1–2 page requirement check
  • Feasibility and first robot selection
  • List of open points and what we need next

This is where every project starts. It costs you nothing and it tells you within a week whether the cell is worth engineering.

Lead time: 3–5 working days

Send a survey

Engineering, per project

S1

Engineered proposal

From USD 900 · credited 100 % against the equipment order

The technical proposal your customer signs off: robot selection, layout, cycle-time calculation, bill of materials with brands, and the quotation — written so you present it as your own.

TierUSDCNY
Tier 1 One robot, standard peripherals9006,500
Tier 2 Cell with fixture, track or positioner1,80013,000
Tier 3 Line: several robots, conveyor interface, process equipment3,50025,000

per project · three tiers by complexity

You receive

  • Technical proposal (PDF, white-label on request)
  • Layout drawing and cycle-time calculation
  • Bill of materials with brands named
  • Equipment quotation on EXW / FOB / CIF / DAP

The fee is credited in full against the equipment order, so it is a deposit, not a cost. If the proposal concludes the cell cannot meet your cycle time, the fee is refunded.

Lead time: 5–10 working days

Order via the survey
S2

Simulation

USD 600 / 1,500 · 20 % off with S1

Reach, collision and cycle time verified against the 3D part model before anything is bought — report and video, white-label.

TierUSDCNY
Tier 1 Single robot, one part family6004,300
Tier 2 Cell with external axes or several parts1,50010,800

per project · two tiers

You receive

  • Simulation report: reach, collisions, cycle time
  • Video for your customer
  • Layout corrections fed back into S1

A layout that changes on the screen costs a day. One that changes in steel costs a month and a flight.

Lead time: 5–10 working days

Order via the survey
S3

Pre-integration and FAT

From USD 1,200 per arm · shown as a line in the equipment quotation

The whole cell assembled, wired and run on your sample parts in Wuhu, with a factory acceptance test you witness on a video call, before it is crated.

TierUSDCNY
Per arm Robot, cabinet, pendant, process equipment1,2008,600
Per cell With fixture, track or positioner2,500–6,00018,000–43,000

per arm; per cell with fixture, track or positioner

You receive

  • Cell assembled and wired in our workshop
  • Programs run on your sample parts, figures measured
  • FAT report with photos and video
  • Marked disassembly and the technical package

Site work becomes days, not weeks. It is not sold alone: it is a line in the equipment quotation, so you see exactly what it costs.

Lead time: inside the equipment lead time

What the FAT covers

Your back office, per year or per month

S4

Remote support, annual

USD 1,800 per year · 20 hours included

The engineer who built the cell, in your working hours: screen-share into the pendant, program backup custody, a 4-hour emergency channel, quarterly health check.

PriceUSDCNY
per year · overage USD 60 / CNY 430 per hour1,80013,000

You receive

  • 20 hours of remote engineering per year
  • Program and drawing backup custody
  • 4-hour emergency channel in your time zone
  • Quarterly health check with a written note

Programs and drawings are yours, so most fixes are yours to apply with us watching. This is the number to call when they are not.

Lead time: starts on the day the cell ships

Order
S5

Integrator back-office retainer

From USD 600 per month · your China engineering desk

A fixed block of engineering hours every month: selection, proposals, BOMs, supplier screening, factory audits, FAT witnessing, export documents — with “we never bypass you” written into the contract.

TierUSDCNY
Lite 8 hours a month — a second opinion on every quote6004,300
Standard 24 hours a month — one live project at a time1,50010,800
Plus 56 hours a month, priority scheduling — several projects3,00021,500

per month · three tiers · annual –10 %

You receive

  • Lite: 8 h / month
  • Standard: 24 h / month
  • Plus: 56 h / month + priority scheduling
  • Unused hours roll over one month

Cheaper than a junior engineer, and it comes with a supply chain. The contract says the customer stays yours; that sentence is the product.

Lead time: starts within 5 working days of payment

Compare the tiers

Options

S6

Engineer on site

By agreement per project · USD 450 per man-day + travel

Not the default — the pre-integration is designed so you do not need it. Where a project does, an engineer is arranged.

PriceUSDCNY
per man-day · minimum 5 days · travel at cost4503,200

You receive

  • Engineer on your customer's site
  • Daily report
  • Handover to your team

Sold only when it is needed, priced so nobody has to guess.

Lead time: by agreement

How site work is led
S7

Training

Wuhu: free · Remote: USD 600 per session

Three days in Wuhu on the cell before it ships — free for the integrator's engineers — or two remote half-days after commissioning.

TierUSDCNY
Wuhu 3 days per person on the cell before it ships; travel at your costFree免费
Remote 2 × half-day after commissioning6004,300

You receive

  • Operation and maintenance on the actual cell
  • Program structure and backups
  • Training videos in the technical package

The best time to learn the cell is while it is still on our floor.

Lead time: scheduled with the FAT

Combine with the FAT

USD is the invoice currency. CNY figures are rounded at about 7.2 and restated at the rate of the day. Prices exclude VAT and withholding in the buyer's country.

How to buy

  1. Send the survey for the workstation type — online with autosave, or the Word file — and the part drawing by e-mail. The free requirement check comes back in 3–5 working days with the recommended service and its price.
  2. Confirm by e-mail. You receive a pro-forma invoice and the services contract filled in — the same text as the published standard terms (PRC law; arbitration).
  3. Bank transfer in USD, EUR or CNY. Work starts within two working days of receipt; a reference number tracks the project from here on.
  4. Delivery as listed above, white-label on request. The S1 fee reappears as a credit line on the equipment invoice.

Read the contract before you order

The standard terms are published, not hidden behind a quotation. Two documents cover everything on this page: the Technical Services Contract (proposals, simulation, remote support, training) and the Back-office Retainer Agreement. Both are specimens — the executed version is issued with the pro-forma invoice, with your details and the project reference filled in. PRC law, CIETAC arbitration (HKIAC on request), English text prevails; Chinese and, for the CIS, Russian alongside.

Technical Services ContractEnglish · 中文 · PDF · 12 clauses + Schedule 1 (S1, S2, S4, S7) Back-office Retainer AgreementEnglish · 中文 · PDF · tiers, hours, no-bypass clause Договор оказания технических услугEnglish · 中文 · Русский · PDF · CNY, VTB route Абонентский договор бэк-офисаEnglish · 中文 · Русский · PDF · CNY, VTB route

Five things the contract says in plain words: the S1 fee is credited against the equipment and refunded if the cell cannot meet your cycle time; we never contact, quote or sell to your end customer, with liquidated damages if we do; deliverables can carry your name; our liability is capped at the fees paid; prices exclude taxes in your country and the contract provides for withholding.

Questions before you buy

Why are service prices published when equipment prices are not?

Services are standardised, small, and decided by your own engineer; equipment depends on the part, the process and the cycle time, and any number published before those are known would be wrong. So: services priced here, equipment quoted after the survey.

How is the S1 fee credited?

The full S1 amount is deducted from the first equipment invoice for the same project, within 12 months of the proposal. If the proposal concludes the cell cannot meet your cycle time, the fee is refunded.

How do I pay?

Pro-forma invoice, bank transfer in USD, EUR or CNY. Work starts within two working days of receipt. No card payments in phase one; no price is ever quoted in chat.

Who pays taxes in my country?

Prices exclude VAT and withholding tax in the buyer's country. Where your tax office requires withholding, the contract provides for gross-up or a tax certificate — see the FAQ on the partnership page.

Can the deliverables carry my brand?

Yes. Proposals, simulation reports and FAT reports can be issued under your name (white label). We appear only where a certificate names the manufacturer.

Start with the free requirement check   Retainer tiers compared   How we work

Reviewed and maintained by Fengor Hu, Sales Director, LIVESPOWER · Last updated September 2026 · Figures are taken from certificates, manufacturer datasheets and our own project records.
WhatsAppTelegramEmail
LinkedInYouTubeTikTokFacebookXInstagram