Seventeen projects engineered by our team for customers in Russia and the CIS — painting, powder coating, arc welding, adhesive application and automotive body-shop tooling. Customer names, plant locations and prices are not published; what is published is the workpiece, the robot and paint-system configuration, the commercial terms and what actually happened. Twelve were delivered; five are engineered proposals that reached quotation or contract-draft stage and are shown as worked-out configurations, not as sales.

Two categories are labelled throughout: Delivered project — equipment shipped, installed or accepted. Engineered proposal — full engineering, configuration and quotation completed; the order was not concluded. We do not present proposals as deliveries.

Delivered projects (12)

3D model of the vacuum gripper assembly for handling steel truck wheels
Delivered project · Robot painting Steel truck-wheel painting line — two GR680-2700 robots in mirrored booths Two CMA GR680-2700 explosion-proof robots paint both faces of steel truck wheels (Ø17.5–26 in, up to 76 kg, 8 wheel types) in mirrored water-curtain booths on a continuous overhead conveyor, tracked by a 2,000 pulse-per-revolution encoder. Delivered ex works in 10 weeks; pre-acceptance in China passed every item.
MarketRussia
IndustryCommercial vehicles
Delivered project · Robot painting Passenger-car body painting at 23 JPH — four GR6150-2900 robots with rotary bells Four CMA GR6150-2900 robots (ATEX Zone 1/21) paint car bodies at 23 jobs per hour from two opposed stations with conveyor tracking, using electrostatic rotary bells, servo gear-pump metering and 5-colour change. Delivered eight weeks after deposit and commissioned on site; the customer later re-ordered 13 spare-part items.
MarketRussia (contract via a UAE engineering company)
IndustryAutomotive OEM
Delivered project · Robot painting Car-body interior painting — four robots on two 11 m linear tracks, with door openers Body-in-white interior painting with four CMA GR6150-2900 robots on two 11 m seventh-axis tracks: on each track one inverted robot opens the hood, front, sliding and swing doors while the second paints. Delivered 6–8 weeks after deposit, with the whole station pre-assembled and function-tested in China.
MarketRussia
IndustryAutomotive OEM
Delivered project · Robot painting Twelve GR6150-2900 robots pre-fitted to OEM specification (arm-only supply) Twelve CMA GR6150-2900 arms — six left-hand, six right-hand — supplied without paint equipment and pre-fitted to the customer's own specification: Siemens servo motors and drives, JH gearboxes, wall pass-through machining, Igus cabling and purge interlocks, function-tested as a complete station in China before shipment.
MarketRussia
IndustryAutomotive OEM
Complete glass gluing cell pre-assembled in China before shipment
Delivered project · Adhesive / sealant application Windshield and window-glass urethane application cell — 7.5 JPH required, 14–18 JPH measured One EFORT ER25-2300 robot applies heated polyurethane to nine glass types across three car models, fed by three centering tables with Keyence laser measurement at ±0.2 mm. The customer required 7.5 jobs per hour; measured output at trial production was 14, 16.7 and 17.9 JPH on the three models. Delivered CIF and accepted.
MarketRussia
IndustryAutomotive OEM assembly
Delivered project · Robot painting Cylindrical steel parts on a rotating hanging line — seven GR6150-1500 robots, GOST paint system Seven floor-mounted CMA GR6150-1500 robots coat cylindrical steel parts (Ø152 × 810 mm, 60 kg) on an existing overhead line running at 1.0 m/min, 300 parts per hour, hangers rotating at 120 rpm. GOST single-colour system, SAMES guns and pumps, pressurised Ex ib mb pxb IIC T4 Gb protection for a ПУЭ class В-Iа area.
MarketRussia
IndustryMetal parts
Large-part spray booth with grating floor and rail track
Delivered project · Pretreatment and e-coat Suspension components — pretreatment and cathodic e-coat line with programmed hoists A dipping line for automotive suspension parts on 3,600 × 900 × 1,200 mm hangers, up to 38 m² of surface and 500 kg per load, at a 6 min line cycle with 3 min of current: spray and dip degrease, zinc phosphating at 46–54 °C, cathodic e-coat at 30–34 °C for 180 s, ultrafiltration and a 160–180 °C oven. Two contracts concluded.
MarketRussia
IndustryAutomotive components
3D model of the seventh-axis floor rail with carriage and drive
Delivered project · Robot hardware supply A 13.4 m painting seventh axis built for an Italian robot manufacturer A single-carriage seventh axis for an Italian robot manufacturer's panel painting line: 13,360 mm overall, 11,700 mm effective travel, 1 m/s, carriage load ≤1,000 kg, repeatability ±0.2 mm, matched to GR6150-2900 and GR6100 hollow-wrist robots. Delivered 45 days after deposit, EXW, in euros, with drawings approved by the customer's engineering department.
MarketItaly
IndustryRobot manufacturer / integrator
Delivered project · Robot hardware supply Robot and positioner hardware package for an integrator — KUKA KR20 with a self-centering positioner Hardware-only supply to a Russian robot centre: one KUKA KR20 R1810-2 with a KRC4 cabinet and a three-external-axis drive package, plus a self-centering single-axis vertical positioner with a Ø1,400 mm faceplate, and motors and cables for a second positioner. Delivered in 60 calendar days, CPT Chelyabinsk railway station.
MarketRussia
IndustryRobot integrator
Finished body-in-white welding fixture before shipment
Delivered project · Automotive body shop BIW tooling package for an electric model — 65 fixture sets across 29 stations Body-in-white welding tooling for a new electric model at a passenger-car assembly plant in western Russia: 65 fixture sets over 29 stations — engine compartment, floor frame, body-side, door assemblies, roof cross-members, luggage sub-assemblies and four main-framing stations. The plant supplied its own arc-welding robots, positioners, welding sets, fume extraction and fencing; we supplied every fixture, hanger, shared base plate and the control interface, pre-assembled and inspected in China before shipment. Signed August 2024.
MarketRussia
IndustryPassenger car plant
Welding fixture on a mobile frame
Delivered project · Automotive body shop A second model at the same plant — 54 fixture sets, 20 stations, inspected in China before shipment The plant that bought the tooling package above returned about eighteen months later for a compact electric car: 20 stations, around 54 fixture sets, six of them robot welding stations, with nine hangers, four manual rotary fixtures and six station-level control conversions. Payment ran over six milestones, one of them tied to completing the first round of equipment inspection in China — the plant signs the inspection off before anything ships. Contracted February 2026, shipped in containers in August 2026.
MarketRussia
IndustryPassenger car plant
Welding line with stands and robot cells
Delivered project · Automotive body shop Body-shop retooling for a model change — about 180 welding stands, priced and commissioned stand by stand A model change at a passenger-car plant in north-west Russia: about 180 welding stands, hanging jigs and special stations — wheel-arch hemming, door inner-panel welding, boot-lid mastic application — newly built or renovated, with pneumatic and electrical control converted to a jig-box scheme. Every item was matched to the plant's own asset codes and priced with its own installation and commissioning line, so the changeover could be staged shop by shop instead of stopping the line as one.
MarketRussia
IndustryPassenger car plant

Engineered proposals (5)

These were configured, simulated and priced but not concluded — requirements changed, the scope moved to booths and ovens, or open technical questions stayed open. They are published because the engineering behind them is what a buyer is actually evaluating.

Engineered proposal · Robot painting Complete bus-body painting line — six robots on 15 m explosion-proof tracks (engineered proposal) A complete three-coat 2K line for bus bodies of 12,500 × 2,550 × 3,300 mm and 5 t: six Yaskawa MPX-3500 robots on six 15 m explosion-proof seventh axes, three dry booths of 19,000 × 6,800 × 5,300 mm with supply-air conditioning, three ovens and a 20 m heavy-duty roller bed — about twenty 40 ft containers. Quoted, not concluded.
MarketRussia
IndustryBuses and coaches
Engineered proposal · Robot painting Robotising an existing plastic exterior-parts line — five GR6150-2900, 12-colour base coat (engineered proposal) Converting the manual primer, base and clear coat stations of a 2007 plastic-parts line to five tracking CMA GR6150-2900 robots: 2-colour 1K primer, 12-colour 1K base including pearl, and externally mixed 2K clear, at film builds of 8–12 / 15–30 / 30–40 µm on a 0.3–2.5 m/min conveyor. Quoted twice, stopped at contract draft.
MarketRussia
IndustryAutomotive plastics
Engineered proposal · Robot painting Machine housings on a 72 m floor track — GR6150-2900 robots with colour change (engineered proposal) Small housings and parts painted inside and outside in different colours, on a 72 m seventh-axis floor track with HIWIN rails, German helical rack and 3 kW explosion-proof motors. The proposal moved from eight single-gun robots to five robots with 3-colour plus solvent change and 2K mixing; requirements changed and it was not concluded.
MarketRussia
IndustryGeneral machinery
Engineered proposal · Robot welding Tram-frame arc-welding cells — two single-robot stations with positioners (engineered proposal) Two single-robot arc-welding stations for tram frame sub-assemblies: EFORT ARC12-2000 and ARC12-1400 with MIG/MAG in 18 % CO₂ + Ar, 500 A water-cooled pulse sources, a twin-column headstock–tailstock positioner and a two-axis P-type positioner. Not concluded — 18 open technical questions were never answered.
MarketRussia
IndustryRail vehicles
Engineered proposal · Powder coating Electrical-cabinet powder coating with 3D vision path generation (engineered proposal) One six-axis robot coats the interiors and hard-to-reach areas of electrical cabinets from 150 × 150 to 2,000 × 1,000 mm and 10–450 mm deep, while reciprocators with four guns per side cover the outer faces. A 3D laser camera identifies the cabinet type, corrects its position and generates the path; line speed 1–2 m/min, 24/7.
MarketRussia
IndustryElectrical enclosures

Send us the same three inputs

Every project above started from the same three things: part drawings or dimensions, the paint or process specification, and the required cycle time. With those we can return a model selection and a configuration; without them any number is a guess.

Request a quote

Reviewed and maintained by Fengor Hu, Sales Director, LIVESPOWER · Last updated September 2026 · Figures are taken from certificates, manufacturer datasheets and our own project records.
WhatsAppTelegramEmail
LinkedInYouTubeTikTokFacebookXInstagram