Home › Projects › Complete bus-body painting line — six robots on 15 m explosion-proof tracks (engineered proposal)
Engineered proposal · Robot painting · Russia

Complete bus-body painting line — six robots on 15 m explosion-proof tracks (engineered proposal)

A complete three-coat 2K line for bus bodies of 12,500 × 2,550 × 3,300 mm and 5 t: six Yaskawa MPX-3500 robots on six 15 m explosion-proof seventh axes, three dry booths of 19,000 × 6,800 × 5,300 mm with supply-air conditioning, three ovens and a 20 m heavy-duty roller bed — about twenty 40 ft containers. Quoted, not concluded.

This is an engineered proposal: the configuration below was fully worked out and quoted, but the order was not concluded. It is published as engineering, not as a delivered installation.

The problem the customer brought

Not enough skilled operators, a manual process that was hard to manage, and finish quality that was hard to control.

Workpiece

Bus bodies 12,500 × 2,550 × 3,300 mm, 5,000 kg, on a floor chain conveyor at 2,000 mm track gauge.

Robots

6 × Yaskawa MPX-3500 (three left, three right, DX200 cabinets, 15 m Ex teach-pendant cables, PROFINET I/O) with six 15 m seventh axes of our own build — explosion-proof motors, Ex cable carriers, single carriage, automatic lubrication and leg covers.

Process and equipment

Three 2K coats: epoxy primer Translack EPX 3300 by airless at 120–150 bar with 0.28–0.33 mm tips; PUR 5405 G90 filler by AirMix at 120–160 bar, 3:1; acrylic-PU high-gloss topcoat. Three dry spray booths 19,000 × 6,800 × 5,300 mm with supply-air conditioning and extraction, three drying ovens, a 20 m heavy-duty floor roller bed and one transfer car; a 380 V to 220 V three-phase transformer for the robots.

Commercial terms

Lead time 3–4 months, EXW; approximately twenty 40 ft containers.

Shipping terms on current projects: EXW, FOB, CIF or DAP. Customer names, plant locations and prices are not published.

How it ended

Stopped at quotation stage. The cost sheet showed robots at about 89 % of their selling price — a mark-up of roughly 12 % — while booths with air conditioning ran at about 80 % and the tracks at about 69 %. On a line like this the margin is in the booths and ovens, not in the robots.

What we do differently because of this project

The customer's technical specification asked in writing for a 2K mixing unit, in-arm mixers, a flushing system and waste-solvent collection; not one of them appeared in the offer, and an item not listed is an item supplied free later. Twenty 40 ft containers quoted EXW also leaves the buyer carrying large clearance and inland costs, so a CPT alternative is now offered alongside, to stop the total investment being underestimated.

Other projects

Delivered project Steel truck-wheel painting line — two GR680-2700 robots in mirrored booths
Delivered project Passenger-car body painting at 23 JPH — four GR6150-2900 robots with rotary bells
Delivered project Car-body interior painting — four robots on two 11 m linear tracks, with door openers