Delivered project · Robot hardware supply · Russia

Robot and positioner hardware package for an integrator — KUKA KR20 with a self-centering positioner

Hardware-only supply to a Russian robot centre: one KUKA KR20 R1810-2 with a KRC4 cabinet and a three-external-axis drive package, plus a self-centering single-axis vertical positioner with a Ø1,400 mm faceplate, and motors and cables for a second positioner. Delivered in 60 calendar days, CPT Chelyabinsk railway station.

The problem the customer brought

Not enough skilled operators, a manual process that was hard to manage, and finish quality that was hard to control.

Workpiece

Rotational parts Ø200–1,400 mm, 10–500 kg.

Robots

1 × KUKA KR20 R1810-2 with KRC4 and a three-external-axis drive package.

Process and equipment

Self-centering single-axis vertical positioner (Ø1,400 mm faceplate, synchronised jaws), plus KUKA motors and cables for a second positioner. Hardware only, no commissioning.

Commercial terms

60 calendar days, CPT Chelyabinsk railway station.

Shipping terms on current projects: EXW, FOB, CIF or DAP. Customer names, plant locations and prices are not published.

Result

Delivered. The buying entity changed mid-project and the contract was re-signed as two contracts.

What we do differently because of this project

Trilingual contracts — Chinese, Russian and English — are checked clause by clause before signature and state which language prevails. On this one the payment terms and the delivery time had diverged between the versions.

Other projects

Delivered project Steel truck-wheel painting line — two GR680-2700 robots in mirrored booths
Delivered project Passenger-car body painting at 23 JPH — four GR6150-2900 robots with rotary bells
Delivered project Car-body interior painting — four robots on two 11 m linear tracks, with door openers

All projects →

Reviewed and maintained by Fengor Hu, Sales Director, LIVESPOWER · Last updated September 2026 · Figures are taken from certificates, manufacturer datasheets and our own project records.
WhatsAppTelegramEmail
LinkedInYouTubeTikTokFacebookXInstagram